New Ground-Up Construction

Sandstone 2
Apartment Complex

A five-building, ground-up multifamily residential development — from the first shovel in the ground to the finishing touches of paint, trim, and the smiles that come with a job done right.

5
Buildings
2022
Construction Start
23+
Site Photos
100%
New Construction

Ground-Up Multifamily Development

Sandstone 2 is a new ground-up construction project delivering a five-building apartment complex — and we did it all. Work began in mid-2022 with site preparation, excavation, and engineered concrete foundations, progressing through structural framing, exterior work, mechanical systems, and interior finishes. Every phase of this project was self-performed, from the first concrete footing to the final coat of paint, the last piece of trim, and the pride that comes with handing over a completed community.

  • Site preparation and excavation
  • Concrete foundation footings and slab work
  • Reinforced rebar structural systems
  • Block work and masonry
  • Structural framing — 5 buildings
  • Exterior siding and roofing
  • Asphalt paving and site work
  • Landscaping and site finishes
  • Certificates of Occupancy obtained

Project Details

Project Sandstone 2 Apartments
Project No. 22-162
Type New Ground-Up Construction
Buildings 5 Residential Buildings
Construction Start August 2022
Site Work December 2023
Owner Zidan Management Group

Project Timeline

Key milestones in the Sandstone 2 ground-up construction sequence, from initial site work through project completion.

1
Summer 2022

Site Preparation & Foundation Work

Site clearing, excavation, and installation of engineered concrete footings with reinforced rebar systems. Anchor bolt placement and foundation engineering per approved blueprints.

2
Fall–Winter 2022

Structural Foundation & Block Work

Continued foundation work including block masonry, concrete wall construction, and structural reinforcement across all five building footprints.

3
Early 2023

Concrete Slab & Structural Progress

Concrete slab pours, structural framing, and vertical construction progress across the five-building complex. Site inspections and documentation of construction milestones.

4
2023

Exterior Work, MEP & Finishes

Roofing, siding, windows, plumbing, electrical, HVAC, and interior finish work across all five buildings. Inspections and Certificates of Occupancy obtained.

5
December 2023

Site Work & Asphalt Completion

Final site work including asphalt paving of parking areas and drives, landscaping, and site finishes. Project completion and turnover to ownership.